TESTIMONIALS

We are incredibly proud of the positive feedback we receive from our clients and partners, read some of this below:

Innovation and efficiency

The way the steel members shafted through several floors on the diagonal so the whole building itself became the structure not just components, with everything working together in a super-efficient structure is very, very innovative.

Richard Johnson
Director and Principal Architect, Johnson Pilton Walker

Innovation and efficiency

The way the steel members shafted through several floors on the diagonal so the whole building itself became the structure not just components, with everything working together in a super-efficient structure is very, very innovative.

Richard Johnson
Director and Principal Architect, Johnson Pilton Walker

Pragmatic construction sequencing

The highly complex structural challenges have been met by a combination of elegant design solutions and pragmatic construction sequencing in order to achieve maximum value for the client, and in particular the use of post tensioning in the frame, composite steel and concrete construction of the compression tubes, and temporary support from the heritage building during construction.

Judges comment
Institution of Structural Engineers’ Structural Awards 2016

Pragmatic construction sequencing

The highly complex structural challenges have been met by a combination of elegant design solutions and pragmatic construction sequencing in order to achieve maximum value for the client, and in particular the use of post tensioning in the frame, composite steel and concrete construction of the compression tubes, and temporary support from the heritage building during construction.

Judges comment
Institution of Structural Engineers’ Structural Awards 2016